What should be done when air conditioning copper pipe goes through the wall?


Release time:

2023-04-26

1、Because of the inconsistency of the location of the holes will affect the building's façade effect, and the location of the pre-embedded casing is difficult to fix, so the construction is recommended to use the reserved foam (150 * 150). 2, casing installation, the upper and lower floors should be hanging through the line will be installed in the plastic casing in place, and to ensure that the facade is neat and beautiful. 3, air conditioning through the wall hole slope to the outdoors, the general slope of 10%. 4, condensation drainage branch pipe is generally in the hole directly below the hole, from the center of the air conditioning through the wall hole for 200.

1、Because of the inconsistency of the location of the holes will affect the building's façade effect, and the location of the pre-embedded casing is difficult to fix, so the construction is recommended to use the reserved foam (150 * 150).

2, casing installation, the upper and lower floors should be hanging through the line will be installed in the plastic casing in place, and to ensure that the facade is neat and beautiful. 

3, air conditioning through the wall hole slope to the outdoors, the general slope of 10%. 

4, condensation drainage branch pipe is generally in the hole directly below the hole, from the center of the air conditioning through the wall hole for 200.

Related News

CONTACT


Email

997203307@qq.com

Monday to Saturday 8:30 - 18:00

Guangzhou CHUANQIANGSHU Building Materials Co.

Name:Liu Querqing liu xiaoqing

Position:General Manager/CEO

Tel:18927593669

Email:997203307@qq.com

Address:No.1 Zhugangshan Road, Hengjiang Landscape Bridge, Shatou Street, Panyu District, Guangzhou, China

Liu Querqing/CEO

Liu Querqing/CEO

Zhu Zhenqiang/Deputy General Manager

Zhu Zhenqiang/Deputy General Manager

MESSAGE

Submit →

Copyright © 2023 Guangzhou chuanqiangshu Building Materials Co., Ltd.