What is the use of shear wall tie rods through the wall?


Release time:

2023-04-26

The role of through-wall screw is mainly to fix the template, so that the strength and steel of the template to improve, not to expand the mold. Shear wall penetrating screw has two kinds of cases: one is the basement shear wall with water-stopping penetrating screw; to be removed after the template, the water-stopping screw to protect the water-stopping iron piece of the plastic flared head removed, and then cut the screw at both ends of the tensile screw, with waterproofing mortar to make up for the flat, generally more than the concrete shear wall protrudes from the 5-8MM; the second case is used for the floor of shear walls in a plastic casing in the penetration of the screw, to be removed after the template will be extracted, for the upper turnover use, exterior walls or walls with waterproofing requirements for the wall of penetration of the screw. After the removal of the screw will be withdrawn for the turnover of the upper floor, the screw hole in the external wall or wall with waterproofing requirements must be removed with an electric drill to remove the plastic casing, and then block one side with a wooden wedge to avoid leakage, smoothed with micro-expansion concrete or waterproof mortar, or filled with special foam, and then the wooden wedge is withdrawn to make up for the leveling.

     The function of the through-wall screw is mainly to fix the formwork, so that the strength and rigidity of the formwork can be improved, so as not to expand the mold. There are two situations for the wall-penetrating screw of the shear wall: one is the wall-penetrating screw with water stop for the basement shear wall; The screw rods at both ends of the pull screw are cut off and leveled with waterproof mortar, which generally protrudes 5-8MM than the concrete shear wall; After the formwork is removed, the screw is pulled out for the turnover of the upper layer. The screw hole of the outer wall or the wall with waterproof requirements must be cleaned of plastic sleeves with an electric drill, and then blocked with a wooden wedge to avoid leakage. Use micro-expansion concrete or waterproof Smooth it with mortar, or fill it with a special foaming agent, and then pull out the wooden wedge to fill it up.

shear wall

Related News

CONTACT


Email

997203307@qq.com

Monday to Saturday 8:30 - 18:00

Guangzhou CHUANQIANGSHU Building Materials Co.

Name:Liu Querqing liu xiaoqing

Position:General Manager/CEO

Tel:18927593669

Email:997203307@qq.com

Address:No.1 Zhugangshan Road, Hengjiang Landscape Bridge, Shatou Street, Panyu District, Guangzhou, China

Liu Querqing/CEO

Liu Querqing/CEO

Zhu Zhenqiang/Deputy General Manager

Zhu Zhenqiang/Deputy General Manager

MESSAGE

Submit →

Copyright © 2023 Guangzhou chuanqiangshu Building Materials Co., Ltd.